The Rosenstein Tunnel on the B10 with a length of 1059 m was opened. HBI Haerter planned the tunnel ventilation and its control.
The Rosenstein Tunnel on the B10 with a length of 1059 m was opened. HBI Haerter planned the tunnel ventilation and its control.
back-to-top